ij½¨Öþ¹¤³ÌÊ©¹¤°²È«¹ÜÀí¼Æ»®£¨ÖÐÓ¢ÎÄ·­Ò룩 - ͼÎÄ ÏÂÔØ±¾ÎÄ

Must comply with GB/T3609.1-94 Must be mask Must comply with GB/T3609.1-94 Must comply with GB/T 3609.1-94Must be helmet Mask & goggles for welding, polishing and cutting

Sample of Eye and Face Protection Equipment

ÑÛ¾¦ºÍÁ³²¿·À»¤É豸

Respirator, gloves and boot

Must comply with LD29-92 Must comply with GB12624-1990 Must comply with LD50-94£¬GB12017-89 and GB12011-2000

Sample of Gloves¡¢Respirator¡¢Boot

ÊÖÌס¢ºôÎüÆ÷¡¢°²È«Ð¬Ñùʽ

Page 29 of 50 Rev.01

Safety rain boot

Sample of Rain Boots

°²È«ÓêЬÑùʽ

Overhead Work and Fall-off Protection

Safety belt must comply with GB6095-85, equipped from head to foot, with two separate lanyards and hooks, as well as a shock absorber

Sample of Safety Belt

°²È«´øÑùʽ

Page 30 of 50 Rev.01

Overhead Work and Fall-off Protection

Where extension ladder of braceless scaffold goes up and down on the fixed elevator that is 7.3m above the ground, extension reel or rope pothooks are required.

Sample of Pothooks

¹Ò¹³Ñùʽ

Overhead Work and Fall-off Protection

Erection of horizontal lifesaving rope Steel wire rope¡Ý6.5mm

Three rope clamps at each end eye bolt and hook bolt

Connector (steel wedge ring) and fastener Strength¡Ý5400lbs(2449kg)

Sample of Lifesaving Rope

ÉúÃüÏß°²×°Ñùʽ

6. Safety orientation and training requirements °²È«½ÌÓýÓëÅàѵ¹ÜÀí¹æ¶¨ 6.1 Safety orientation °²È«½ÌÓý

Page 31 of 50 Rev.01

Anyone involved in this project should receive a safety orientation or training first prior to his entrance to site. Nobody is allowed to site without such training from the owner or the management company. Neither entrance nor work on site is allowed without such training. ·²²Î¼Ó±¾ÏîÄ¿µÄÈËÔ±¡¢ÔÚ½øÈ빤µØÇ°±ØÐëÊ×ÏȽÓÊÜÏîÄ¿²¿µÄÈý¼¶Ê©¹¤°²È«½ÌÓýºÍÅàѵ£¬Î´¾­ÏîÄ¿²¿°²È«½ÌÓýµÄÈËÔ±²»µÃ½øÈëÓÉÒµÖ÷»ò¹ÜÀí¹«Ë¾×éÖ¯µÄÊ©¹¤°²È«½ÌÓýºÍÅàѵ¡£Î´¾­ÒµÖ÷»ò¹ÜÀí¹«Ë¾Ê©¹¤°²È«½ÌÓýºÍÅàѵµÄÈËÔ±Ò»Âɲ»µÃ½øÈëÊ©¹¤ÏÖ³¡£¬¸ü²»µÃ½øÈëÊ©¹¤ÏÖ³¡½øÐÐÊ©¹¤×÷Òµ¡£

Visitors to this project should be accompanied with project personnel and approved prior to entrance.

·²½øÈëÊ©¹¤ÏÖ³¡²Î¹ÛµÄÈËÔ±±ØÐëÓÉרÈËÅãͬ£¬²¢µÃµ½¹ÜÀí²ãͬÒâºó·½¿É½øÈëÊ©¹¤ÏÖ³¡²Î¹Û¡£

6.2 NTCC¡¯s Contents for safety training ÄÏͨ½¨¹¤°²È«½ÌÓýÄÚÈÝ: ?

Policy and target for safety ±¾ÏîÄ¿µÄ°²È«·½ÕëºÍ°²È«Ä¿±ê£»

?

Rules for entrance, loading & unloading as well as traffic of vehicles on site ³µÁ¾½øÈ롢װжºÍͨÐй涨£»

?

Regulations to fight against high temperature, drug and alcoholic ¸ßΡ¢½û¶¾ºÍºÈ¾ÆµÄÓйع涨£»

?

PPE

ÈËÉí·À»¤ÓÃÆ·¼°É豸µÄÅ䱸¼°Ê¹Óã»

?

Special Construction Equipments and Tools Usage and Operation ÌØÊâÊ©¹¤É豸µÄʹÓù涨

?

Safety Management Regulation for Pre-activity¡¢During-activity¡¢Post-activity Ê©¹¤»î¶¯¿ªÊ¼Ç°¡¢»î¶¯ÖС¢»î¶¯ºó°²È«¹ÜÀí¹æ¶¨

?

Regulations for civilized work ÎÄÃ÷Ê©¹¤µÄ¹æ¶¨£»

?

Work permitting system ×÷ÒµÐí¿ÉÖ¤ÖÆ¶È£»

?

Fire fighting training ·À»ðѵÁ·£»

?

For emergency ½ô¼±Ê¹ʴ¦Àí¡£

?

Regulation for Construction Safety Review¡¢Assessment¡¢Audit¡¢Correction¡¢Encouragement & Punishment

Ê©¹¤°²È«¼ì²é¡¢ÆÀ¹À¡¢É󼯡¢Õû¸Ä¡¢½±ÀøºÍ³Í·£¹ÜÀí¹æ¶¨

Page 32 of 50 Rev.01